 |
|
 |
 |
 |
|
|
|
MAIN GEARBOXES OF "MIL"
HELICOPTERS
|
The main gearboxes VR-14 and VR-24 are
designed for installation on helicopters Mi-14, Mi-8MT/17, Mi-8АMT/171,
Mi-8MTV/172, Mi-24/25/35 and their modifications.
Its
purpose is to transmit the power from two engines, i.e. TV3-117M/MT/VM
(VR-14), TV3-117V/VMA
(VR-24),
VK-2500
(VR-14 and VR-24), to the main rotor, helicopter sets and to the
antitorque rotor via the tail transmission with the corresponding to the
rotation speed change as well as aerodynamic forces from the main rotor
and the gearbox casing to the helicopter fuselage. The main
gearboxes circuit is fixed-ratio, planetary.
|

|
MAIN TECHNICAL
SPECIFICATIONS |
|
|
VR-14
|
VR-24
|
|
Gear ratio:
- to main rotor shaft
-
to tail rotor shaft
|
0,0128 0,1729
|
0,016 0,2158
|
|
Inlet shaft rotation
speed, nominal, RPM
|
15000
|
15000
|
|
Power being transferred
by main gearboxes:
|
2100 2х1900 2х1700
|
2360 2х2200 2х1700
|
|
Mass, kg
|
842,5
|
830
|
|
Overall dimensions, mm:
|
1200 880 1760
|
1210 885 1765
|
|
Developer: Klimov Сorporation |
|
|
KRASNY OCTIABR (since 1976) and
Reductor-PM OJSC (since 1986)
perform full-scale production of the VR-14 main gearbox. The production of VR-14
in
KRASNY OCTIABR totaled near 2000 units.
|
|
KRASNY OCTIABR
develops the repair documentation for the VR-14 and VR-24 main gearboxes,
performs all types of repair, including overhaul and local field repair. |
|
Service lifetime and calendar service life
of
main gearboxes VR-14 |
|
Gearbox
layout |
Manufacture date
|
Service lifetime (SLT) and calendar service life (CSL) |
Permitted service life for on-condition maintenance (OCM), hours |
Calendar service lives established for OCM, years |
|
Till the first overhaul |
Assigned |
Between
overhauls |
Till the first overhaul |
Between
overhauls |
|
SLT,
hours |
CSL, years |
SLT, hours |
CSL,
years |
SLT, hours |
CSL,
years |
|
7870.0100 |
since 01.04.1979
till 01.05.1983 |
1000 |
10 |
6000 |
* |
1000 |
8 |
2000*1 |
- |
1500*2 |
2000*3 |
Till the first overhaul - 20
Between
overhauls - 20 |
|
7870.0200 |
since 01.05.1983
till 01.07.2000 |
1000 |
10 |
6000 |
* |
1000 |
8 |
2000*1 |
3500*5 |
1500*2 |
2000*3 |
|
7870.0200 |
since 01.07.2000
till 01.01.2005 |
2000 |
10 |
6000 |
* |
1000 |
8 |
- |
3500*5 |
1500*2 |
2000*3 |
|
7870.0200 |
since 01.01.2005 |
2000 |
10 |
6000 |
* |
2000*3 |
10*3 |
- |
3500*5 |
- |
- |
|
|
|
*
Assigned calendar service life is
defined by service life until the first overhaul and between
overhauls.
*1
Bulletins Nos. 200-7-0-0290-4 (6.180.15-БЭ) и
208.6.0.0105.4 (6.140.14-БЭ).
*2
Bulletin No.200-5-0-0419-04 (К7870-02 БЭ-В).
*3
Bulletin No.200-6-0-0423-04 (5.180.43 БЭ-В, БЭ-Г).
*4
Bulletin No.200.8.0.0434.04 (К7870-07 БЭ-В).
*5
For
regulated operating conditions in compliance with Resolution No.
612VR-117-08 (the bulletin is being prepared). |
|
|
 |
 |
|
|
|
|